Corporate Real Estate & Facility Operations
Office Space Optimization Modeler
Model office space optimization and cost savings
A planning model using the inputs and formula shown below. Example values are illustrative, not market benchmarks.
Tool 31 of 79
Set your assumptions
Enter your values or load the labeled example.
2. Your results
Enter your information and calculate to see your results.
Overview & assumptions
Model office space optimization and cost savings This calculator applies a simplified scenario model. Use amounts and periods consistently; a result is an estimate, not a quote, measured probability, or legal determination.
Results do not include variables absent from the form. Review the formula and detailed breakdown before acting, and verify current prices, contractual terms, and applicable rules separately.
Formula
Savings = Current Cost - Optimized Cost
Hypothetical worked example
- Current Sq Ft
- 10,000
- Current Cost/Sq Ft ($)
- 50
- Optimized Sq Ft
- 7,000
- Optimized Cost/Sq Ft ($)
- 45
Savings: $185,000.00
- Current Cost: $500,000/year
- Optimized Cost: $315,000/year
- Annual Savings: $185,000
These sample values demonstrate the arithmetic and do not describe a real business.
Resources
Browse the sourced business explainers for context on assumptions and decision-making.