Corporate Real Estate & Facility Operations

Office Space Optimization Modeler

Model office space optimization and cost savings

A planning model using the inputs and formula shown below. Example values are illustrative, not market benchmarks.

Tool 31 of 79

Set your assumptions

Enter your values or load the labeled example.

Tool guide ↓Use calculator

1. Enter your information

2. Your results

Enter your information and calculate to see your results.

Overview & assumptions

Model office space optimization and cost savings This calculator applies a simplified scenario model. Use amounts and periods consistently; a result is an estimate, not a quote, measured probability, or legal determination.

Results do not include variables absent from the form. Review the formula and detailed breakdown before acting, and verify current prices, contractual terms, and applicable rules separately.

Formula

Savings = Current Cost - Optimized Cost

Hypothetical worked example

Current Sq Ft
10,000
Current Cost/Sq Ft ($)
50
Optimized Sq Ft
7,000
Optimized Cost/Sq Ft ($)
45

Savings: $185,000.00

  • Current Cost: $500,000/year
  • Optimized Cost: $315,000/year
  • Annual Savings: $185,000

These sample values demonstrate the arithmetic and do not describe a real business.

Resources

Browse the sourced business explainers for context on assumptions and decision-making.

Read how we publish and correct content.